The following is a list of our libraries and the architects responsible for the new build (NB) or redevelopment (RD).
| Location | Architect | Timeline |
|---|---|---|
| Central Highlands Ballan Library Ballarat Library (RD) |
Croxon Ramsay Pty Ltd Studio Hollenstein |
Opened 2025 Opened 2024 |
| Connected Cranbourne Hub (NB) |
Opening 2029 |
|
| Geelong Biyal-a Amstrong Creek (NB) Chilwell Library (RD) |
Buchan Architects Terry Atchison Architects |
Opened 2024 Opening 2026 |
| Goulburn Valley Yarrawonga Library, Events and Performance Precinct (NB) |
N2SH Design Studio |
Opening 2026 |
| Greater Dandenong Keysborough South Community Hub (NB) |
Group GSA |
Opened 2025 |
| Hobsons Bay Altona North (RD) |
PaperArc |
Opened 2025 |
| Melbourne Southbank (RD) |
DKO Architecture | Opening 2026 |
| Mitchell Seymour (RD) |
Jaxmax | Opening 2027 |
| Monash Glen Waverley |
Lyons Architect |
Opening 2028 |
| Moonee Valley Ascot Vale Library (RD) |
N2SH Design Studio |
Opened 2025 |
| Myli Warragul Library (NB) |
Croxon Ramsay |
Opening 2027 |
| Towong Corryong Library (RD) |
Eames Architects |
Opened 2026 |
| Yarra Plenty Rosanna Library (NB) |
Canvas Projects |
Opened 2025 |
| Your Library Bayswater (NB) Croydon Community Wellbeing Precinct (RD) |
Every Detail |
Opened 2025 Opening 2029 |