The following is a list of our libraries and the architects responsible for the new build (NB) or redevelopment (RD). 

LocationArchitectTimeline
Central Highlands
Ballan Library

Ballarat Library (RD)
 

Croxon Ramsay Pty Ltd
 
Studio Hollenstein


Opened 2025

Opened 2024
Connected
Cranbourne Hub (NB)
 Brand Architects
Opening 2029
Geelong
Biyal-a Amstrong Creek (NB)

Chilwell Library (RD)

Buchan Architects

Terry Atchison Architects

Opened 2024

Opened 2026
Goulburn Valley
Yarrawonga Library, Events and Performance Precinct (NB)

N2SH Design Studio

Opened 2026
Greater Dandenong
Keysborough South Community Hub (NB)

Group GSA

Opened 2025
Hobsons Bay
Altona North (RD)

PaperArc

Opened 2025
Melbourne
City Library (RD)

Southbank (RD)


DKO Architecture
Opening 2028

Opened 2026
Merri-Bek
Coburg (NB)
Durbach Block Juggers with Architect AssociatesOpening 2029
Mitchell
Seymour (RD)
JaxmaxOpening 2027
Monash
Glen Waverley

Lyons Architect

Opening 2028
Moonee Valley
Ascot Vale Library (RD)

N2SH Design Studio

Opened 2025
Myli
Warragul Library (NB)

Croxon Ramsay

Opening 2027
Towong
Corryong Library (RD)

Eames Architects

Opened 2026
Yarra Plenty
Rosanna Library (NB)

Heidelberg West Library (NB)

Canvas Projects

Banyule Council

Opened 2025

Opened 2026
Your Library
Bayswater (NB)

Croydon Community Wellbeing Precinct (RD)

Every Detail



Opened 2025

Opening 2029