














The following is a list of our libraries and the architects responsible for the new build (NB) or redevelopment (RD).
| Location | Architect | Timeline |
|---|---|---|
| Central Highlands Ballan Library Ballarat Library (RD) | Croxon Ramsay Pty Ltd Studio Hollenstein | Opening 2026 Opened 2024 |
| Connected Cranbourne Hub (NB) | Opening 2029 | |
| Geelong Biyal-a Amstrong Creek (NB) Chilwell Library (RD) | Buchan Architects Terry Atchison Architects | Opened 2024 Opening 2026 |
| Goulburn Valley Yarrawonga Library, Events and Performance Precinct (NB) | N2SH Design Studio | Opening in 2026 |
| Greater Dandenong Keysborough South Community Hub (NB) | Group GSA | Opened in 2025 |
| Hobsons Bay Altona North (RD) | PaperArc | Opened 2025 |
| Monash Glen Waverley | Lyons Architect | Opening 2028 |
| Moonee Valley Ascot Vale Library (RD) | N2SH Design Studio | Opened 2025 |
| Myli Warragul Library (NB) | Croxon Ramsay | Opening 2027 |
| Towong Corryong Library (RD) | Eames Architects | Opening 2026 |
| Yarra Plenty Rosanna Library (NB) | Canvas Projects | Opened 2025 |
| Your Library Bayswater (NB) Croydon Community Wellbeing Precinct (RD) | Every Detail | Opened 2025 Opening 2029 |